Home › Office Remodeling › Lighting & Electrical
Commercial Electrician in Los Angeles
Office lighting and electrical work gives your team even, glare-free light at every desk, plus the circuits, outlets and data lines your layout needs. Los Angeles Home Remodelers is a commercial remodeling contractor for LED retrofits, Title 24 lighting controls and power upgrades across Los Angeles, CA.
One project manager runs LADBS electrical permits and plan check where your scope needs them, landlord and building approvals, and night or phased work so your office stays open. Most office suites take about 1–4 weeks on site. A free walkthrough sets your price, and you’ll get it as a written, itemized estimate.
Bonded & Insured | Written Workmanship Warranty
We count your fixtures, open the panel and check what the layout needs for power and data. No charge, no obligation.
Thanks — we got your request. We'll call you to set up your free in-home visit.
Office lighting in LA
Serving businesses across Los Angeles, CA.
Office lighting works when light lands where people work: on desks, whiteboards and faces on a video call, never as glare on a screen. We plan the fixtures, the controls and the circuits together, so the ceiling, the walls and the panel follow one drawing.
A 1970s high-rise floor often still runs fluorescent troffers on aging ballasts. A mid-century low-rise may have a panel with no open spaces left for new workstations.
We find both at the walkthrough and price the fix before you commit.
Lighting and electrical services
Book one scope or all three. The same project manager runs the fixtures, the controls and the power.
A commercial lighting retrofit swaps fluorescent troffers for LED, with new fixtures or retrofit kits that fit the housings already in your ceiling. You get lower power bills, no flickering tubes and far fewer lamp changes.
A retrofit counts as a lighting alteration, so controls can come with it (see the Title 24 section below).
A new floor plan needs a new lighting plan. We space fixtures for even light on desks, hang pendants over conference tables and wash corridor walls so halls don’t read as dim.
Lenses get picked to keep glare off screens, and you see the layout before anything’s ordered.
Every new desk, copier and break room appliance needs a circuit that can carry it. Our electricians add circuits, floor boxes and power poles, and they upgrade the panel when the load calculation says it’s full.
Breaker shutdowns happen at night or on weekends, booked with your building engineer.
How it works
Four steps take you from a walkthrough to lights that pass inspection. Nothing gets ordered until the controls and circuits are settled.
We count fixtures, read your panel schedule, look above the ceiling and note which rooms sit along windows.
We draw the fixture layout, the controls and any new circuits, then file with LADBS where your scope needs a permit.
Electricians pull wire, set boxes and sensors and core floor boxes while your office is closed. Rough inspection follows.
Fixtures go up and controls get programmed and tested. You receive a labeled panel schedule and the control settings in writing.
California’s Title 24 energy code covers lighting in office alterations, and replacing enough fixtures brings in lighting control requirements. Depending on the space, those can include occupancy sensing, multi-level dimming, daylight zones and automatic shutoff after hours.
Whether your fixture count crosses the trigger, which controls apply and whether acceptance testing is needed, we confirm with LADBS for your scope. You see the answer on your estimate, not as a plan check correction.
Layers and controls
Each tab is one layer or control your suite may need. Pick one to see what it does and where it goes.
Sensors turn lights off when a room empties. An occupancy sensor switches lights on and off for you, while a vacancy sensor waits for you to switch them on and shuts them off after you leave.
Fixtures near windows dim on their own when the sun’s strong. A photosensor reads the light in the zone and lowers the row closest to the glass first.
Task lighting puts focused light on the desk, so the ceiling layer can run softer. Under-shelf LEDs and desk lamps suit anyone who reads paper all day.
Each new room or desk cluster adds load to your panel. We run the load calculation, add dedicated circuits where equipment needs them and route power through walls, floor boxes or power poles.
Data cable runs above the ceiling to every desk, printer and wireless access point. Where the ceiling space returns air, the cable has to be plenum-rated.
Moving walls changes the way out. Exit signs and emergency lights may need to move or be added so the route to each exit stays lit, and plan check reviews it. We confirm what your layout needs with LADBS.
Fixture types
Choose fixtures by the room and the ceiling you have. Most suites mix three or four of these.
Fixture
Best for
Watch out for
Ceiling it suits
LED flat panel or troffer
Open offices and general work areas
Glare if the lens is too bright
Lay-in grid
Troffer retrofit kit
Fast retrofits that keep the old housings
Rusted or damaged housings rule it out
Existing grid troffers
Linear pendant
Open ceilings and long desk runs
Needs exact alignment over desks
Open or high ceilings
Recessed downlight
Corridors, reception and restrooms
Too few leave dark gaps on the walls
Drywall or grid
Track and accent lights
Art walls, displays and reception
Glare if aimed toward seating
Any, on a surface track
Most offices land at a neutral white, around 3500K to 4000K. Warmer light suits reception and lounges, and every fixture in one room should match.
Low-glare lenses and indirect pendants keep bright spots off monitors. We place fixtures by how desks face, not just by the grid.
Some lighting control installs need acceptance tests by a certified technician before final inspection. We schedule them when your scope calls for it.
Specialty pendants and linear runs often ship weeks after the order, so we place it as soon as your layout’s approved.
One walkthrough tells you whether your panel has room, which controls your scope likely needs and how many nights the work takes. There’s no charge and nothing to sign.
Questions
Short answers on LED retrofits, controls, permits, panels and working after hours.
Even LED ambient light at a neutral white, with low-glare lenses and task lights at the desks, suits most offices. Add dimming in conference rooms and daylight controls near windows. The fixture table above shows what fits each room.
Usually, yes, when you add circuits, move fixtures or change controls, because that’s electrical work LADBS permits. Swapping like-for-like lamps usually isn’t. Larger scopes add plan check and Title 24 forms, and we confirm with LADBS for your scope.
Most suites take about 1–4 weeks on site, set by fixture count, controls and any panel work. Kit retrofits move fastest because the housings stay. Permits and long-lead fixtures come first, and your schedule goes in the contract.
For most offices, yes. LED fixtures use less power, run cooler and last far longer than fluorescent tubes, so lamp changes and ballast failures mostly stop. Savings depend on your hours and fixture count, so we don’t promise a number.
If your project changes enough fixtures, Title 24 calls for automatic shutoff, and occupancy or vacancy sensors are the usual way to meet it. Private offices and restrooms get them most often. We confirm with LADBS for your scope.
Yes. We run most wiring by day inside closed-off zones and save breaker shutdowns for nights or weekends, booked with your building engineer. Servers and refrigerators stay powered unless we’ve planned the switchover with you.
Yes. We pull cable to each desk, printer and access point, or set the pathways and boxes for your IT vendor’s crew to cable. The Data tab above covers how it’s routed.
Yes, for any wiring in a commercial space. Panels, circuits and lighting controls are permitted work done by qualified electricians and inspected by LADBS in the City of Los Angeles. Our electricians handle the lighting and power under the same contract as the rest of your remodel.
More office services
Tenant build-outs and office renovations, scheduled around your lease date.
Lay-in grid, acoustic tiles, and supply and return air for every new room.
Carpet tile, LVT, concrete and porcelain, installed after hours on a tested slab.
From the blog
Now booking free walkthroughs
Good office lighting starts with a fixture count, a panel check and the right controls. Book your free walkthrough and leave with a layout plan and a written, itemized estimate.
Mon–Sat, 8am–6pm
We count fixtures, check the panel and price fixtures, controls and circuits line by line. No charge, no obligation.
Thanks — we got your request. We'll call you to set up your free in-home visit.