Home › Restaurant Remodeling › Long Beach
Long Beach restaurant and bar contractor
Long Beach runs its own health department, so restaurant plans go to the city, not the county. Los Angeles Home Remodelers, a restaurant remodeling contractor in Long Beach, CA, builds commercial kitchens, hoods and ventilation, grease interceptors, floors, dining rooms and bars, storefronts and patios from Pine Avenue to Belmont Shore.
One project manager handles the Building and Safety Bureau’s plan check and permits, the Bureau of Environmental Health’s food-facility plan check and landlord approvals. Hood fire suppression goes to licensed specialty trades, and after-close phases keep you serving. Most restaurant remodels last about 4–12 weeks on site after permits issue, and a free walkthrough brings a written, itemized estimate.
Bonded & Insured | Written Workmanship Warranty
We check the gas meter, the duct route and the grease setup before or after service. Free.
Thanks — we got your request. We'll call you to set up your free in-home visit.
Long Beach restaurant remodeling
Serving Pine Avenue, Belmont Shore and restaurants across Long Beach, CA.
Restaurant remodeling in Long Beach answers to the city more than the county. Your food-facility plans go to the city’s own Bureau of Environmental Health, and your gas, water and sewer come from Long Beach Utilities.
That keeps most approvals local, and we work with both from the first drawing. A larger cooking line often means a larger gas meter, so we raise it with the utility early instead of finding out at the rough inspection.
Older downtown buildings add another layer. Restaurants under offices or apartments need a duct route the neighbors can live with, and storefronts in historic districts need the Planning Bureau’s input before drawings go far.
Restaurant services
Take on one piece or a full restaurant build-out. Each trade works from the same drawings on one contract.
Pine Avenue restaurants often sit under offices or apartments, so a grease duct can’t simply rise straight up. We plan the route, fan and makeup air with your landlord, and licensed specialists handle the suppression.
Long Beach Utilities runs the city’s sewer. We size and set your interceptor or grease trap to your city’s sewer agency’s grease rules, which we confirm for your site, and pipe every dish sink and floor sink to it.
A bigger line pulls more gas, and in Long Beach that gas comes from the city’s own utility. We confirm meter capacity early, then lay out the line, prep and dish areas and stub up every utility your equipment list calls for.
A front on a landmark or in one of the city’s historic districts needs a Certificate of Appropriateness. We contact the Planning Bureau first, then replace glass, doors and awnings or build a patio on private property once the approach is set.
Neighborhood rooms in Belmont Shore live on repeat guests. We rebuild booths, bars, lighting and ceilings to your designer’s plan and phase the work around your busiest nights. Interior-only changes skip historic review.
When a Long Beach space comes with a hood, interceptor and walk-in already in place, reuse can save weeks. We test each one against your menu before you sign and tell you plainly what to clean, repair or replace.
How it works
Both city reviews start early, so your build days don’t wait on paperwork.
We check the meter, panel, sewer and roof with you, and trace a duct route through the floors above.
For a landmark or historic-district front, we contact the Planning Bureau before the exterior design gets detailed.
The Building and Safety Bureau gets the building set, and the Bureau of Environmental Health gets the food-facility plans.
We phase loud work after close, clear each rough inspection and line up the closing sign-offs in the order each agency sets.
The Building and Safety Bureau’s Permit Center issues building, electrical, plumbing and mechanical permits. Online permitting is open only to registered licensed contractors, so we file for you. The Long Beach Department of Health and Human Services, Bureau of Environmental Health, reviews your food-facility plans.
Interior alterations with no exterior change don’t need historic review. A storefront change on a landmark or in one of the city’s 18 historic districts needs a Certificate of Appropriateness. Grease interceptor sizing follows your city’s sewer agency’s grease rules, which we confirm for your site.
Under offices and apartments
A ground-floor restaurant under offices or apartments shares its roof, its walls and its noise. The hood and the schedule both get planned around the people above.
In a mixed-use building, we check:
Hood suppression belongs to a licensed fire-protection specialist, who installs and tags it before any fire inspection your scope calls for. That test lands before the city’s health final.
Pre-war downtown buildings often call for an asbestos check before demolition. Surprises that change the price come to you in writing, with a cost, before we keep going.
Long Beach restaurant remodel cost
Your duct route, gas capacity and storefront rules set the price more than the room’s size.
A restaurant under three floors of neighbors costs more to vent than one with an open roof above. Your written estimate breaks out each item, ready to set against any allowance in your lease.
A long or enclosed grease duct run adds material, fire wrap and labor.
A larger meter follows the utility’s schedule and can add weeks.
A Certificate of Appropriateness can shape materials and add design time.
Breaking slab, new drain lines and patching the floor add days.
Staying open means more shifts and more setup, though fewer lost sales.
One free walkthrough shows whether the building can vent your line and feed it gas. The written scope is yours to keep.
Questions
Straight answers for Long Beach owners, chefs and landlords.
The city’s own. The Long Beach Department of Health and Human Services, Bureau of Environmental Health, reviews food-facility plans here instead of the county. We file with it once your equipment schedule is final.
Usually not. Long Beach states that interior alterations with no physical exterior change skip historic review. A storefront or facade change needs a Certificate of Appropriateness, so we contact the Planning Bureau first.
Online permitting is limited to registered licensed contractors. As your contractor, we file the building, electrical, plumbing and mechanical permits and book each inspection.
Long Beach Utilities provides gas, water and sewer, and SCE delivers power. If your new line needs a larger gas meter, we raise it with the utility early because its schedule can set your start date.
Often, for part of it. Dining room, bar and front work can run after close in phases. Gas or hood work usually needs a short closure, planned for your slowest days.
Expect about 4–12 weeks on site for most remodels after permits issue. A gas meter upgrade or a historic storefront review can add time before construction starts.
Keep reading
Our restaurant remodel process, walkthrough through final inspection.
A commercial kitchen planned and roughed in around your equipment.
From the blog
Now booking free walkthroughs
Start with the duct, the gas and the storefront rules, and the build follows. Los Angeles Home Remodelers takes your Long Beach restaurant from city review to opening on a single contract.
Mon–Sat, 8am–6pm
We’ll trace the duct route, check the meter and send a written scope. Free.
Thanks — we got your request. We'll call you to set up your free in-home visit.