Home › Whole-Home Remodeling › Design-Build
One contract for design, engineering, permits, and the build, with your construction budget set while we design.
CSLB Lic. [#000000] | Bonded & Insured | Written Workmanship Warranty
We walk the house, talk through your plans, and outline the design phase. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Design-build project, Whole-home remodel, Open concept / wall removal, Custom home or rebuild, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).
We walk the house with you and outline what the design phase will cover. Book a slot.
You see a construction budget before the design is final. See how it works.
Serving: Toluca Lake, Pasadena, Eagle Rock, Los Feliz, Hancock Park, Cheviot Hills, and Culver City.
Design-build remodeling in Los Angeles puts your design, engineering, permits, and construction under one contract with one licensed team. Los Angeles Home Remodelers prices the work while we design it, so the plan you approve is a plan you can afford to build.
You get a single point of responsibility. If a drawing misses a duct or a beam, that’s our problem to fix, not a fight between your architect and your builder.
Older LA houses punish a design drawn from the sidewalk. We cut test openings, check the attic and crawlspace, and pull the permit history before your layout’s final.
Certified Service
CSLB Lic. [#000000]
Design-build is how we deliver the work. These pages cover the work itself: whole-house updates, wall removal, new homes, and attic or basement rooms.
Not sure where to start?
[YOUR PHONE]
Every room, system, and permit on one schedule, with one team from design to final.
SEE THE SERVICE →
Take out walls safely, with an engineered beam, posts, and footings where the load lands.
SEE THE SERVICE →
Knock down and rebuild, or build new on your lot, within LA zoning and hillside rules.
SEE THE SERVICE →
Turn an attic or crawlspace into a legal bedroom, office, or suite with headroom and egress.
SEE THE SERVICE →
Ask who draws the plans, who stamps the engineering, and whose name is on the contract. Then look up the CSLB license: a design build firm that builds should hold a B general license.
Ask when you’ll see a construction budget. A design build contractor in Los Angeles who only prices after the drawings is running design-bid-build under one logo. Your design agreement should list every item below.
Your project manager runs design, permits, and the build, and answers your calls. You never referee a designer and a contractor over whose fault a problem is.
Everything in the contract is a line item. Any change gets priced and signed before a crew touches it, so nothing shows up on a final invoice as a surprise.
Dust walls, floor protection, and a locked site at the end of each day. If you're living in the house, we phase the work so you always have a kitchen or a bathroom.
Each phase ends with something you can hold: a budget, a drawing set, a permit. You approve one before we start the next, so you’re never paying to design a house you can’t build.
We walk the house, check zoning in ZIMAS, and set a target construction budget with you. If the wish list and the budget don't match, you hear it now, before anyone draws a line.
Floor plans, elevations, and 3D renderings show the layout before it's framed. After each review round, we reprice the budget, so design and cost move in step.
A licensed structural engineer sizes beams, posts, footings, and shear walls from our measurements. Value engineering happens here, like trading a steel beam for wood when the span allows.
We submit the drawings, structural calcs, and Title 24 energy report to LADBS, then answer plan-check comments until the permit issues. Culver City and Pasadena run their own building departments [confirm], so we file wherever your house sits.
The project manager who ran design runs the build. You get a schedule, weekly updates, milestone payments, and a final walk-through before we close the permit.
Design-build pays off most when a project touches structure, systems, and permits at once. These five come through our door most often.
Every room, the wiring, and the plumbing on one plan. One budget covers all of it, so you don’t hear about the old panel after the tile’s picked.
A closed kitchen opened to the living room. Design sets the beam, the island, and the new circuits in one pass, and you approve renderings before a wall comes down.
A bedroom and bath on the ground floor for aging in place. We draw wider doors and a curbless shower now, so the house keeps working for decades.
More room without losing the yard. Zoning floor-area limits and the foundation decide the size, so we check both before design starts.
After a fire, one team runs the survey, design, rebuild permits, and build, and prices scope in the format your insurer asks for [confirm].
The method you pick decides when you learn the price. Design-build sets the construction budget during design; the other two find it out afterward.
Question
Design-build
Architect, then bid
Owner-managed
Who designs
Our designer and engineer
Your architect, hired first
You, or a drafter you hire
Who prices
Us, during design
Bidding contractors, after plans
Each trade, one at a time
Budget set
Before drawings are final
After the full drawing set
Trade by trade, as you go
Who owns problems
One contract, one team
Split: architect or builder
You do
Change orders
Priced and signed first
Gaps between plans and bid
Hard to track
One price for the scope in your contract. You carry less risk, and any change goes through a written change order. Choose it when design is complete and you want a firm number.
You pay actual cost plus an agreed fee, with open books. It suits jobs with big unknowns, like an older house where the walls haven’t been opened yet.
A placeholder amount for items you haven’t picked, such as tile or light fixtures. We set allowances from your real choices, not showroom minimums, so they hold.
With architect-then-bid, plans often come back over budget, and you pay to redraw them before a second bid round. Design-build prices as it goes, which is how you skip that round.
Your house’s era decides what we check before a single line gets drawn. Here’s where the design phase spends its time in each.
1910s–30s
Walls rarely match any old plan, and plaster hides knob-and-tube wiring. We open test holes before design, and in HPOZ districts we plan time for historic review of street-facing changes [verify].
1940s–60s
Slab floors lock in the plumbing, so moving a bath means trenching. We keep wet rooms near existing lines when your layout allows, and route new ducts through the low attic before ceiling heights get set.
1950s–70s
Hillside lots often need a survey and a soils report before design, and hillside rules cap added area [verify]. Split levels in Eagle Rock add stairs to every layout choice.
1980s–2000s
Original plans are often on file with LADBS, which speeds design. Shear walls sit where you’d least expect, so our engineer marks which walls can move before you fall for a layout.
Any era
A past owner’s unpermitted addition shows up in the permit records, or not at all. We compare the house to the records during design, then price what it takes to legalize or rebuild that work [verify].
Most of it does. Structural changes, new circuits, moved plumbing, and added area all need LADBS permits and inspections, and design-build folds that paperwork into the design phase. Finish-only work usually doesn’t.
California’s Title 24 energy code applies to permitted remodels and additions. Our designer and energy consultant prepare the compliance forms with the drawings, so insulation, window, and lighting choices get settled in design [verify].
LADBS reviews stamped structural calcs with the drawings. Plan-check comments come back to us, and we answer them with the engineer, so you don’t carry that back-and-forth [confirm].
We pull permits under our CSLB license [confirm]. An owner-builder permit makes you the legal contractor, with responsibility for the trades, the inspections, and the risk.
The lowest whole-house bid in Los Angeles usually leaves out the beam, the panel, or the permit. We price the real scope during design, so your change-order column stays close to empty.
CSLB Lic. [#000000]
Measured, not guessed
On our workmanship
No day labor on site
A design-build remodel runs in six phases. Design and plan check take longer than most owners expect, and the build moves faster because it’s planned.
Phase 01
We walk the house, review zoning, and talk through your goals and target budget. You get a written design proposal within [1–2] weeks.
Phase 02
Floor plans, 3D renderings, and finish choices take about [6–10] weeks. After each review, we reprice the construction budget so you approve both at once.
Phase 03
The structural engineer sizes beams and footings while the Title 24 report gets prepared. Expect [2–4] weeks, often overlapping final design.
Phase 04
LADBS plan check usually runs [6–12] weeks for a whole-house remodel. We answer corrections and hold your build slot while the permit issues.
Phase 05
You sign the build contract, we order long-lead items like windows, and we walk the schedule together. If you’re staying home, we set the phasing now.
Phase 06
Construction runs about [4–9] months by scope, with city inspections at each stage. We finish with a punch list, final inspection, and your as-built plans.
One visit tells you what your house allows, how the design phase works, and where your budget lands. The consult is free, and you won’t sign anything.
or send the form and we’ll call you back.
We walk the house, talk through your plans, and outline the design phase. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Design-build project, Whole-home remodel, Open concept / wall removal, Custom home or rebuild, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).
We design and build from Studio City and Van Nuys to Pasadena, Beverly Hills, and Venice, in century-old homes and newer ones. Don’t see your neighborhood below? Call and ask.
Click a question to see the answer. The first one is open to start.
Call and a project manager answers, not a call center.
Design-build is a delivery method where one company designs your remodel and builds it under one contract. You hire one team, and it owns the drawings, the engineering, the permits, and the construction. It replaces the usual order of hiring an architect first, then collecting contractor bids.
Usually not, and it’s rarely cheaper either. Design fees and construction costs land in a similar place. What design-build saves is the redesign round, when an architect’s plans come back over budget and you pay to redraw them. Pricing during design keeps the plan inside your number.
In design-bid-build, you hire an architect, finish the plans, and then collect contractor bids. In design-build, one team designs and prices in the same phase. The real difference is timing: you learn the construction cost while you can still change the design, not after the drawings are done.
Your design agreement decides that, so read it before you sign. Ours gives you a copy of the drawings for your house once the design phase is paid [confirm]. Some firms keep the plans until you sign the build contract. Ask which rule applies before you pay any design fee.
Yes. If you already have an architect, we can join during design as the builder, pricing the drawings as they develop and flagging costly details early. That’s often called a preconstruction agreement. You keep your architect, and we take responsibility for the build contract [confirm].
You get a target budget at the first design meeting and an updated one after each review. By the time drawings are final, the construction budget is priced line by line, with allowances marked. You sign a build contract only after you’ve seen and accepted that number.
That depends on the agreement [confirm]. Some design-build firms credit part of the design fee to the build contract, and others don’t. Either way, your agreement should state the fee, what it covers, and whether a credit applies before you pay a deposit. California also limits home-improvement deposits [verify].
Plan on [2–4] months for design, engineering, and Title 24 work on a whole-house remodel, then [6–12] weeks of LADBS plan check. Smaller projects move faster. Your quick decisions on layout and finishes shorten design more than anything we do.
Yes, through a written change order. Each change gets priced and signed before a crew touches it, with its effect on the schedule spelled out. Changes cost least during design, when they’re lines on a drawing, and most after framing or drywall goes up.
We cut test openings during design, so fewer surprises are left to find. What we can’t see gets a contingency line in your construction budget. If we hit rot, bad wiring, or a hidden beam, we photograph it and price the fix as a change order you approve first.
Cabinets, countertops, islands, and permits under one contract.
Walk-in showers, tub conversions, vanities, and accessible baths.
Detached ADUs, garage conversions, and JADUs, designed and built.
DESIGN SLOTS OPEN FOR [MONTH] AND [MONTH]
A design-build remodel gives you one contract, a budget set during design, and one team to call. Los Angeles Home Remodelers handles design, engineering, permits, and construction. Book your free design-build consult today.
Mon–Sat, 8am–6pm
We walk the house, talk through your plans, and outline the design phase. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Design-build project, Whole-home remodel, Open concept / wall removal, Custom home or rebuild, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).