Design-Build Remodeling in Los Angeles, CA

One contract for design, engineering, permits, and the build, with your construction budget set while we design.

CSLB Lic. [#000000]  |  Bonded & Insured  |  Written Workmanship Warranty

Book a Free Consultation

We walk the house, talk through your plans, and outline the design phase. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Whole-Home Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Design-build project, Whole-home remodel, Open concept / wall removal, Custom home or rebuild, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).

Free Consultation

We walk the house with you and outline what the design phase will cover. Book a slot.

Budget Before Drawings

You see a construction budget before the design is final. See how it works.

Design-build in LA

One Team Designs and Builds Your LA Remodel

Serving: Toluca Lake, Pasadena, Eagle Rock, Los Feliz, Hancock Park, Cheviot Hills, and Culver City.

Design-build remodeling in Los Angeles puts your design, engineering, permits, and construction under one contract with one licensed team. Los Angeles Home Remodelers prices the work while we design it, so the plan you approve is a plan you can afford to build.

You get a single point of responsibility. If a drawing misses a duct or a beam, that’s our problem to fix, not a fight between your architect and your builder.

Older LA houses punish a design drawn from the sidewalk. We cut test openings, check the attic and crawlspace, and pull the permit history before your layout’s final.

Certified Service
CSLB Lic. [#000000]

More whole-home services

Where Design-Build Goes in Your LA Home

Design-build is how we deliver the work. These pages cover the work itself: whole-house updates, wall removal, new homes, and attic or basement rooms.

Not sure where to start?
[YOUR PHONE]

Whole-Home Remodeling in Los Angeles

Every room, system, and permit on one schedule, with one team from design to final.

SEE THE SERVICE →

Open-Concept Remodels & Wall Removal

Take out walls safely, with an engineered beam, posts, and footings where the load lands.

SEE THE SERVICE →

Custom Home Building

Knock down and rebuild, or build new on your lot, within LA zoning and hillside rules.

SEE THE SERVICE →

Basement & Attic Conversions

Turn an attic or crawlspace into a legal bedroom, office, or suite with headroom and egress.

SEE THE SERVICE →

Choosing a Design-Build Contractor in LA

Ask who draws the plans, who stamps the engineering, and whose name is on the contract. Then look up the CSLB license: a design build firm that builds should hold a B general license.

Ask when you’ll see a construction budget. A design build contractor in Los Angeles who only prices after the drawings is running design-bid-build under one logo. Your design agreement should list every item below.

Working with us

What Working With Us Looks Like

One point of contact

Your project manager runs design, permits, and the build, and answers your calls. You never referee a designer and a contractor over whose fault a problem is.

Written scope, written changes

Everything in the contract is a line item. Any change gets priced and signed before a crew touches it, so nothing shows up on a final invoice as a surprise.

A clean site, every evening

Dust walls, floor protection, and a locked site at the end of each day. If you're living in the house, we phase the work so you always have a kitchen or a bathroom.

The five phases

What Each Design-Build Phase Delivers in LA

Each phase ends with something you can hold: a budget, a drawing set, a permit. You approve one before we start the next, so you’re never paying to design a house you can’t build.

Feasibility & Budget

We walk the house, check zoning in ZIMAS, and set a target construction budget with you. If the wish list and the budget don't match, you hear it now, before anyone draws a line.

Design & 3D Renderings

Floor plans, elevations, and 3D renderings show the layout before it's framed. After each review round, we reprice the budget, so design and cost move in step.

Structural Engineering

A licensed structural engineer sizes beams, posts, footings, and shear walls from our measurements. Value engineering happens here, like trading a steel beam for wood when the span allows.

Permits & Plan Check

We submit the drawings, structural calcs, and Title 24 energy report to LADBS, then answer plan-check comments until the permit issues. Culver City and Pasadena run their own building departments [confirm], so we file wherever your house sits.

Build & Closeout

The project manager who ran design runs the build. You get a schedule, weekly updates, milestone payments, and a final walk-through before we close the permit.

Project types

Remodels We Run as Design-Build in LA

Design-build pays off most when a project touches structure, systems, and permits at once. These five come through our door most often.

Whole-House Remodel

Every room, the wiring, and the plumbing on one plan. One budget covers all of it, so you don’t hear about the old panel after the tile’s picked.

Kitchen and Living Rework

A closed kitchen opened to the living room. Design sets the beam, the island, and the new circuits in one pass, and you approve renderings before a wall comes down.

Main-Floor Suite

A bedroom and bath on the ground floor for aging in place. We draw wider doors and a curbless shower now, so the house keeps working for decades.

Second-Story Addition

More room without losing the yard. Zoning floor-area limits and the foundation decide the size, so we check both before design starts.

Fire Rebuild

After a fire, one team runs the survey, design, rebuild permits, and build, and prices scope in the format your insurer asks for [confirm].

Delivery methods

Design-Build vs. Design-Bid-Build in LA

The method you pick decides when you learn the price. Design-build sets the construction budget during design; the other two find it out afterward.

Question

Design-build

Architect, then bid

Owner-managed

Who designs

Our designer and engineer

Your architect, hired first

You, or a drafter you hire

Who prices

Us, during design

Bidding contractors, after plans

Each trade, one at a time

Budget set

Before drawings are final

After the full drawing set

Trade by trade, as you go

Who owns problems

One contract, one team

Split: architect or builder

You do

Change orders

Priced and signed first

Gaps between plans and bid

Hard to track

Fixed-price contract

One price for the scope in your contract. You carry less risk, and any change goes through a written change order. Choose it when design is complete and you want a firm number.

Cost-plus contract

You pay actual cost plus an agreed fee, with open books. It suits jobs with big unknowns, like an older house where the walls haven’t been opened yet.

Allowances

A placeholder amount for items you haven’t picked, such as tile or light fixtures. We set allowances from your real choices, not showroom minimums, so they hold.

The redesign round

With architect-then-bid, plans often come back over budget, and you pay to redraw them before a second bid round. Design-build prices as it goes, which is how you skip that round.

Local context

How Your LA Home Type Shapes the Design Phase

Your house’s era decides what we check before a single line gets drawn. Here’s where the design phase spends its time in each.

1910s–30s

Craftsman & Spanish

Walls rarely match any old plan, and plaster hides knob-and-tube wiring. We open test holes before design, and in HPOZ districts we plan time for historic review of street-facing changes [verify].

1940s–60s

Post-War Ranch

Slab floors lock in the plumbing, so moving a bath means trenching. We keep wet rooms near existing lines when your layout allows, and route new ducts through the low attic before ceiling heights get set.

1950s–70s

Hillside & Split-Level

Hillside lots often need a survey and a soils report before design, and hillside rules cap added area [verify]. Split levels in Eagle Rock add stairs to every layout choice.

1980s–2000s

Stucco Two-Story

Original plans are often on file with LADBS, which speeds design. Shear walls sit where you’d least expect, so our engineer marks which walls can move before you fall for a layout.

Any era

Previously Remodeled

A past owner’s unpermitted addition shows up in the permit records, or not at all. We compare the house to the records during design, then price what it takes to legalize or rebuild that work [verify].

Permits & code

Which Design-Build Work Needs an LA Permit?

Most of it does. Structural changes, new circuits, moved plumbing, and added area all need LADBS permits and inspections, and design-build folds that paperwork into the design phase. Finish-only work usually doesn’t.

Permit needed in most cases

Usually permit-free

Title 24 rides with the plans

California’s Title 24 energy code applies to permitted remodels and additions. Our designer and energy consultant prepare the compliance forms with the drawings, so insulation, window, and lighting choices get settled in design [verify].

Engineering goes to plan check

LADBS reviews stamped structural calcs with the drawings. Plan-check comments come back to us, and we answer them with the engineer, so you don’t carry that back-and-forth [confirm].

The permit carries our license

We pull permits under our CSLB license [confirm]. An owner-builder permit makes you the legal contractor, with responsibility for the trades, the inspections, and the risk.

Why choose us

Why Homeowners Pick Us Over the Lowest Bid

The lowest whole-house bid in Los Angeles usually leaves out the beam, the panel, or the permit. We price the real scope during design, so your change-order column stays close to empty.

Licensed & Insured

CSLB Lic. [#000000]

Free On-Site Estimates

Measured, not guessed

Written Warranty

On our workmanship

Local LA Crews

No day labor on site

The schedule

How a Design-Build Project Runs in LA

A design-build remodel runs in six phases. Design and plan check take longer than most owners expect, and the build moves faster because it’s planned.

Phase 01

Consult & feasibility

We walk the house, review zoning, and talk through your goals and target budget. You get a written design proposal within [1–2] weeks.

Phase 02

Design & budget

Floor plans, 3D renderings, and finish choices take about [6–10] weeks. After each review, we reprice the construction budget so you approve both at once.

Phase 03

Engineering & energy

The structural engineer sizes beams and footings while the Title 24 report gets prepared. Expect [2–4] weeks, often overlapping final design.

Phase 04

Plan check & permit

LADBS plan check usually runs [6–12] weeks for a whole-house remodel. We answer corrections and hold your build slot while the permit issues.

Phase 05

Preconstruction

You sign the build contract, we order long-lead items like windows, and we walk the schedule together. If you’re staying home, we set the phasing now.

Phase 06

Build & closeout

Construction runs about [4–9] months by scope, with city inspections at each stage. We finish with a punch list, final inspection, and your as-built plans.

Free design consult

Get Your LA Remodel Priced Before It's Drawn

One visit tells you what your house allows, how the design phase works, and where your budget lands. The consult is free, and you won’t sign anything.

or send the form and we’ll call you back.

Book a Free Consultation

We walk the house, talk through your plans, and outline the design phase. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Whole-Home Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Design-build project, Whole-home remodel, Open concept / wall removal, Custom home or rebuild, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).

Service area

Design-Build Remodeling Across Los Angeles County

We design and build from Studio City and Van Nuys to Pasadena, Beverly Hills, and Venice, in century-old homes and newer ones. Don’t see your neighborhood below? Call and ask.

Questions

Design-Build Remodeling FAQs

Click a question to see the answer. The first one is open to start.

Still weighing your options?

Call and a project manager answers, not a call center.

Design-build is a delivery method where one company designs your remodel and builds it under one contract. You hire one team, and it owns the drawings, the engineering, the permits, and the construction. It replaces the usual order of hiring an architect first, then collecting contractor bids.

Usually not, and it’s rarely cheaper either. Design fees and construction costs land in a similar place. What design-build saves is the redesign round, when an architect’s plans come back over budget and you pay to redraw them. Pricing during design keeps the plan inside your number.

In design-bid-build, you hire an architect, finish the plans, and then collect contractor bids. In design-build, one team designs and prices in the same phase. The real difference is timing: you learn the construction cost while you can still change the design, not after the drawings are done.

Your design agreement decides that, so read it before you sign. Ours gives you a copy of the drawings for your house once the design phase is paid [confirm]. Some firms keep the plans until you sign the build contract. Ask which rule applies before you pay any design fee.

Yes. If you already have an architect, we can join during design as the builder, pricing the drawings as they develop and flagging costly details early. That’s often called a preconstruction agreement. You keep your architect, and we take responsibility for the build contract [confirm].

You get a target budget at the first design meeting and an updated one after each review. By the time drawings are final, the construction budget is priced line by line, with allowances marked. You sign a build contract only after you’ve seen and accepted that number.

That depends on the agreement [confirm]. Some design-build firms credit part of the design fee to the build contract, and others don’t. Either way, your agreement should state the fee, what it covers, and whether a credit applies before you pay a deposit. California also limits home-improvement deposits [verify].

Plan on [2–4] months for design, engineering, and Title 24 work on a whole-house remodel, then [6–12] weeks of LADBS plan check. Smaller projects move faster. Your quick decisions on layout and finishes shorten design more than anything we do.

Yes, through a written change order. Each change gets priced and signed before a crew touches it, with its effect on the schedule spelled out. Changes cost least during design, when they’re lines on a drawing, and most after framing or drywall goes up.

We cut test openings during design, so fewer surprises are left to find. What we can’t see gets a contingency line in your construction budget. If we hit rot, bad wiring, or a hidden beam, we photograph it and price the fix as a change order you approve first.

More services

Other Remodels We Handle in LA

Kitchen Remodeling

Cabinets, countertops, islands, and permits under one contract.

Bathroom Remodeling

Walk-in showers, tub conversions, vanities, and accessible baths.

ADU Builders

Detached ADUs, garage conversions, and JADUs, designed and built.

From the blog

Design-Build Guides for LA Owners

DESIGN SLOTS OPEN FOR [MONTH] AND [MONTH]

Get Your LA Remodel Designed by One Team

A design-build remodel gives you one contract, a budget set during design, and one team to call. Los Angeles Home Remodelers handles design, engineering, permits, and construction. Book your free design-build consult today.

Mon–Sat, 8am–6pm

Book a Free Consultation

We walk the house, talk through your plans, and outline the design phase. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Whole-Home Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Design-build project, Whole-home remodel, Open concept / wall removal, Custom home or rebuild, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).