Home › Whole-Home Remodeling › Custom Home Building
Knock down and rebuild, or build new from the ground up, sized to what LA zoning, soils, and fire rules allow on your lot.
CSLB Lic. [#000000] | Bonded & Insured | Written Workmanship Warranty
We walk the lot, pull the zoning, and tell you what you can build. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Custom home or rebuild, Whole-home remodel, Design-build project, Open concept / wall removal, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).
We walk your lot, read the zoning, and tell you how big a new house can get. Book a slot.
Your floor-area and height limits get checked before any sketch. See how it works.
Serving: Los Feliz, Hancock Park, Cheviot Hills, Brentwood, Pacific Palisades, Mar Vista, and Manhattan Beach.
Los Angeles Home Remodelers is the custom home builder Los Angeles owners call when the old house can’t be saved or the lot deserves more. We run ground-up construction under one contract: survey, soils, design, engineering, permits, and the build.
Every custom home starts with what the lot allows. Zoning, slope, soil, and fire zone set the size and shape of the house before anyone draws a floor plan.
LA lots carry rules you can’t see from the street. A flat Valley lot, a Westside lot in an R1 Variation Zone, and a hillside lot in Silver Lake can each hold a very different house on the same square footage.
Certified Service
CSLB Lic. [#000000]
Some houses are worth keeping. If yours has good bones, a whole-home remodel, an open plan, or an attic conversion may get you the space without a teardown.
Not sure where to start?
[YOUR PHONE]
Every room, system, and permit on one schedule, with one team from design to final.
SEE THE SERVICE →
One contract for design, engineering, permits, and construction, with a budget set early.
SEE THE SERVICE →
Take out walls safely, with an engineered beam, posts, and footings where the load lands.
SEE THE SERVICE →
Turn an attic or crawlspace into a legal bedroom, office, or suite with headroom and egress.
SEE THE SERVICE →
Ask who runs the survey, the soils report, and plan check, and who answers LADBS corrections. Check the CSLB license, and confirm it’s a general building (B) license.
Compare what each bid includes, line by line. Early custom-home bids often leave out grading, shoring, utility work, or fire-zone upgrades, then add them later. Your contract prices each line below.
Your project manager runs design, permits, and the build, and answers your calls. You never referee a designer and a contractor over whose fault a problem is.
Everything in the contract is a line item. Any change gets priced and signed before a crew touches it, so nothing shows up on a final invoice as a surprise.
Dust walls, floor protection, and a locked site at the end of each day. If you're living in the house, we phase the work so you always have a kitchen or a bathroom.
Five decisions set how big your new house can be and what it takes to build. Settle the survey and the zoning first, because they cap everything drawn after them.
A licensed surveyor maps your property lines, grades, trees, and utilities. Setbacks are the required open yards at the front, sides, and rear [verify], and the survey shows exactly where the new walls can go.
A geotechnical engineer drills test borings and writes a soils report. It tells the structural engineer whether you need spread footings, a mat slab, or deep piles.
Residential floor area (RFA) is the square footage zoning counts toward your cap. Your zone, lot size, and any R1 Variation Zone set the RFA and the height limit [verify].
Most LA custom homes use wood framing with engineered shear walls, the plywood panels that brace a house against earthquakes. Steel moment frames let you open a wall of glass without losing lateral strength.
New homes in the City of LA are expected to be all-electric [verify]. Heat pumps handle heat and hot water, and solar goes on the roof under Title 24.
Pick a style that fits your street as well as your family. In historic districts and some R1 Variation Zones, the style also has to pass design review.
Flat roofs, big glass, and clean stucco or wood siding. Modern homes fit tight Westside lots because flat roofs keep the house under the height limit.
White plaster, clay tile roofs, arches, and a courtyard. The style fits Los Feliz and Hancock Park streets, and the tile roof needs framing sized for its weight.
Pitched roofs, dormers, lap siding, and shutters. Traditional homes suit Cheviot Hills and the Palisades, where many original houses followed the same pattern.
Low-pitched gables, deep eaves, tapered porch columns, and wood trim. A new Craftsman fits Eastside streets full of 1910s bungalows and still meets current code.
Board-and-batten siding, metal roofs, and big open living rooms. It pairs a simple gable with modern glass, and it’s quick to frame.
Your choice between remodeling and rebuilding hangs on the foundation, the zoning, and how much of the house you’d change. Compare the five paths before you commit to design.
Your path
Best for
Watch out for
Permit path
Keep & refresh
Sound houses that just need updates
Old systems hidden behind plaster
Trade permits only
Major remodel
Good foundation, wrong layout
Scope that quietly grows into a rebuild
Building permit, plan check
Partial teardown
Saving part of the house for zoning
May get treated as new construction [verify]
Plan check as new work [verify]
Knock down & rebuild
Failed foundations, bad layouts
Today’s floor-area and height caps
Demo, grading, building permits
SB 9 split & build
Large lots with room for two homes
Fire zone and historic limits [verify]
Lot split, then permits
Many custom homes get built on a construction loan that pays out in draws as work passes inspection. Talk to your lender early; we plan the schedule around its draw steps.
After a fire, your adjuster and your builder need the same scope. We price line items your insurer can read and track what the policy covers versus your upgrades.
Tearing down takes its own permit. Gas, power, water, and the sewer line get capped or cut first, and older homes need asbestos and lead checks before demo.
A rebuild follows today’s rules, not the old house’s size. If your old home was bigger than current floor-area limits allow, a new one may have to shrink [verify].
Where your lot sits decides which rules shape the house. Here’s what each part of LA usually brings to a custom build.
Valley
Wide, flat lots in Encino and Sherman Oaks give you the most room to build. The Baseline Mansionization Ordinance still caps floor area, and summer heat makes insulation and shade part of the plan.
Westside
Many Westside streets sit in R1 Variation Zones that set their own floor-area and massing rules [verify]. Two lots side by side can carry different limits, so we check ZIMAS before design.
Hillside
The Baseline Hillside Ordinance ties floor area to slope and caps grading [verify]. Expect a geology report, deep piles or caissons, and a street-access review before plans go in.
Fire rebuild
We’re sorry for what your family lost in the January 2025 fire. Rebuilds start with a new survey, a soils check on the burned pad, and the city’s rebuild permit track [verify].
Eastside
Lots in historic districts such as an HPOZ need design review before demolition or new construction [verify]. The board looks at height, roof shape, and materials against the street.
Every new house needs a building permit from LADBS after plan check, the city’s review of your drawings against code. LA City Planning rules set the size, and other agencies sign off on fire, sewer, and streets [verify].
The Baseline Mansionization Ordinance limits how much residential floor area you can build on a flat lot in single-family zones. Garages, covered porches, and tall rooms may count toward it, so we measure every design round [verify].
If your lot sits in a Very High fire hazard severity zone, the house needs ignition-resistant siding, ember-resistant vents, and a Class A roof [verify code section]. We check the map first.
California’s Title 24 energy code sets insulation, windows, solar, and heat-pump rules for new homes. Your energy consultant runs the numbers during design, and the inspector checks them at final [verify].
The lowest whole-house bid in Los Angeles usually leaves out the beam, the panel, or the permit. We price the real scope during design, so your change-order column stays close to empty.
CSLB Lic. [#000000]
Measured, not guessed
On our workmanship
No day labor on site
A custom build runs in six phases. Zoning, plan check, and inspections set the pace more than the framing does.
Phase 01
We order the survey and soils report and pull your zoning. In [4–8] weeks, you’ll know the size, height, and setbacks your house can have.
Phase 02
You approve floor plans, then elevations and finishes. Engineers size the foundation and shear walls while the Title 24 energy report gets done over [3–6] months.
Phase 03
We submit to LADBS and answer every correction. Plan check and agency clearances usually take [3–9] months, and your lender reviews the plans too.
Phase 04
Utilities get capped, the old house comes down, and grading starts. Footings, piles, or a slab go in after the city inspects the forms and steel.
Phase 05
Walls, roof, and shear panels go up, then wiring, plumbing, and ducts. Each trade passes rough inspection before insulation and drywall close it in.
Phase 06
Floors, fixtures, and paint take [3–5] months. After final inspection, LADBS issues your certificate of occupancy and you can move in.
One visit tells you your zoning, rough floor-area limit, slope issues, and whether rebuilding beats remodeling. The consult is free, and you won’t sign anything.
or send the form and we’ll call you back.
We walk the lot, pull the zoning, and tell you what you can build. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Custom home or rebuild, Whole-home remodel, Design-build project, Open concept / wall removal, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).
We build new homes from Silver Lake to Palos Verdes, on flat lots, hillside lots, and fire-rebuild sites. Don’t see your neighborhood below? Call and ask.
Click a question to see the answer. The first one is open to start.
Plan on [18–30] months from first survey to move-in for most lots. Design and plan check often take as long as construction. Hillside lots, fire zones, and design review add time, so we map your schedule at the first consult.
Remodeling usually costs less when the foundation and framing are sound. Rebuilding makes sense when you’d replace the foundation, systems, and layout anyway. We price both paths side by side, so you compare real line items, not guesses.
Your zone, lot size, slope, and any R1 Variation Zone set the limit. The Baseline Mansionization Ordinance caps floor area on flat lots, and the Baseline Hillside Ordinance does it on slopes [verify]. We pull your ZIMAS report and run the math before design.
You need stamped plans, but you don’t always need to hire an architect on your own. Our design-build team brings the designer, structural engineer, and energy consultant under one contract [confirm licensing]. Some owners bring their own architect, and we build from those plans.
LADBS usually asks for one before it approves a new foundation [verify]. A geotechnical engineer tests the ground and tells the structural engineer how deep and wide footings must go. Hillside lots often need a geology report too.
Most construction loans release money in draws after set milestones, such as foundation, framing, and drywall. The lender often sends an inspector first. Ask your lender how its draws work; we match our payment schedule to it. This isn’t financial advice.
A fire hazard severity zone brings stricter materials and defensible-space rules [verify]. Expect a Class A roof, ember-resistant vents, ignition-resistant siding, and tempered glass. SB 9 lot splits may not be allowed in the highest zones [verify].
Start with debris clearance sign-off, a new survey, and a soils check on the old pad. The city has offered a faster permit track for fire rebuilds [verify current rules]. We coordinate the scope with your insurance adjuster so the policy and the plans line up.
In the City of LA, most new homes must be all-electric [verify]. That means heat pumps for heating and hot water, an induction range, and a bigger panel. Title 24 also calls for solar on most new houses, which we lay out during design.
No, not during a knock down and rebuild. You’ll need other housing from demo to the certificate of occupancy. If you’re keeping part of the house, we’ll tell you whether phasing lets you stay for any stretch.
Cabinets, countertops, islands, and permits under one contract.
Walk-in showers, tub conversions, vanities, and accessible baths.
Detached ADUs, garage conversions, and JADUs, designed and built.
LOT CONSULTS OPEN FOR [MONTH] AND [MONTH]
A custom home sized to your zoning, built on engineered footings, and finished to current code gives you a house that fits for decades. Los Angeles Home Remodelers handles the survey, design, permits, and build. Book your free lot consult today.
Mon–Sat, 8am–6pm
We walk the lot, pull the zoning, and tell you what you can build. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Custom home or rebuild, Whole-home remodel, Design-build project, Open concept / wall removal, Attic or basement conversion, Not sure yet), Preferred date, Tell us about your house and plans. Submit button: Book My Free Visit (red #E12228).