HomeHome AdditionsPrimary Suite Additions

Licensed Suite Addition Builders

Primary Suite Additions in Los Angeles, CA

A bedroom, en suite bath, and walk-in closet of your own, added on the ground floor or upstairs of your LA home.

CSLB Lic. [#000000]  |  Bonded & Insured  |  Written Workmanship Warranty

Book a Free Consultation

We walk the lot, find your sewer line, and sketch where the suite fits. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Home-Additions Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Primary suite addition, Home addition, Room addition, Second-story addition, Bump-out, Not sure yet), Preferred date, Tell us about your house and lot. Submit button: Book My Free Visit (red #E12228).

Free Consultation

We pace off the suite, find the sewer line, and check your floor-area limit. Book a slot.

Quiet by Design

Insulated walls and a solid door between you and the kids. See how it works.

Primary suites in LA

A Primary Suite Built Onto Your LA Home

Serving: Los Feliz, Hancock Park, Cheviot Hills, Westchester, Encino, Sherman Oaks, and Altadena.

Los Angeles Home Remodelers designs and builds the primary suite addition Los Angeles couples ask us for most: a quiet bedroom, an en suite bathroom, and a walk-in closet, added off the back or up top. We handle design, engineering, permits, and the build under one contract.

Some people still call it a master bedroom addition. It’s the same project, and it starts with where your sewer line runs and how much floor area your lot has left.

Suites go wrong on the details, so we settle three before anyone draws: how far the bath sits from the sewer line, which walls the closet gets for hanging rods, and what separates your bedroom from the kids’ rooms.

Certified Service
CSLB Lic. [#000000]

More addition services

Other Ways to Add Space to Your LA Home

A suite isn’t the only way to add on. These pages cover a general home addition, a single room off the back, and a full second story.

Not sure where to start?
[YOUR PHONE]

Home Additions in Los Angeles

More square footage out or up, designed to match the house and permitted under one contract.

SEE THE SERVICE →

Room Additions

A bedroom, family room, or bump-out off the back or side, tied into your roof and walls.

SEE THE SERVICE →

Second-Story Additions

Go up instead of out, with new footings, shear walls, and a stair planned from day one.

SEE THE SERVICE →

Choosing a Primary Suite Contractor in LA

Ask where the new bath will drain before you look at tile. Then check the CSLB license, and confirm it’s a B general license that covers the whole addition, not only the finishes.

Compare bids line by line. A low suite bid often leaves out the sewer connection, the sound insulation, or the closet build-out, then adds them as change orders. Your contract prices every line below up front.

Working with us

What Working With Us Looks Like

One point of contact

Your project manager runs the survey, design, permits, and build, and answers your calls. You never chase an architect, an engineer, and a framer for three different answers.

Written scope, written changes

Every item in your suite, down to the closet rods and the shower valve, is a line item. Any change gets priced and signed before a crew touches it.

A clean site, every evening

A sealed-off work zone, floor protection inside, and a locked site each night. We tell you ahead of time which days the new wall opens into the house.

What makes a suite

Five Parts of a Primary Suite in Los Angeles

Five pieces decide how the suite lives day to day. Settle the bedroom layout and the bath location first, because together they set the footprint and the plumbing run.

Bedroom Layout

Your primary bedroom needs one clear wall for the bed, room to walk both sides, and a window that meets egress rules. We put the suite at the far end of the house, so you reach it without passing the kids' rooms.

En Suite Bath

The en suite bathroom goes where its drain can reach the sewer line with enough slope. That's usually the side of the suite nearest the existing bath or the main line.

Walk-In Closet

A walk-in closet needs long walls more than floor area. Two facing walls of hanging rods with an aisle between them beats a square room with one good wall. We plan lights and outlets inside.

Door to the Yard

A sliding door or a pair of French doors opens the bedroom to a private patio. On a slab ranch, we keep the threshold low for a no-step exit. We also check the setback, since a door near the lot line changes what neighbors see.

Natural Light

Set bedroom windows high on walls that face the neighbors and low on walls that face your yard. A skylight or clerestory brings natural light into the bath without a view in.

Suite finish styles

Primary Suite Styles LA Homeowners Choose

Pick a style that matches the rest of the house, so the suite reads as original and not as a box added on.

Calm Minimal

Flat-panel doors, plaster-white walls, and one wood tone. This look suits mid-century and modern homes, and it keeps a smaller suite from feeling crowded.

Warm Wood

White oak floors, wood-slat closet doors, and a wood vanity with a stone top. It fits Craftsman houses, where the new trim can match the original casings.

Spanish Revival Suite

Arched openings, painted tile at the vanity, and wrought-iron hardware. We match the plaster texture and the roof tile, so the addition looks like part of a 1920s Spanish house.

Mid-Century Suite

Wide sliders, a low roofline, and clerestory windows. This look opens a ranch bedroom to the yard, and it’s the easiest style to match on a post-war slab house.

Accessible Ground-Floor Suite

Wide doorways, a curbless shower, and lever handles throughout. It looks like any other suite, but it works for aging in place.

Suite location

Where Should Your Primary Suite Go in LA?

Your lot and your plumbing decide where the suite goes. Match the location to your yard, your floor-area limit, and how far the new bath sits from the sewer.

Suite location

Best for

Watch out for

Plumbing run

Ground-floor rear addition

Aging in place and yard access

Uses yard; rear setback limits size

Short run on a raised floor

Second-story suite

Privacy and keeping the yard

Engineering and a new stair

Stack it over the existing bath

Convert and expand a bedroom

Small lots and tight floor area

You lose a bedroom during the work

Tie into the nearby bath

Suite over the garage

Two-story homes with an attached garage

Garage footings may need work

Long run; check the slope

Suite with a bump-out bath

A large bedroom that lacks a bath

Roof tie-in on a short wall

Short, on an outside wall

Curbless shower

A shower with no curb, a linear drain, and a bench. It’s the easiest shower to use at any age, and in a new addition we set the floor low from the start.

Soaking tub

A deep freestanding or drop-in tub for long soaks. Plan one only if you’ll use it, because it takes floor space a bigger shower or a double vanity could use.

Double vanity

Two sinks with drawers between them, on a wall at least [60] inches long. It ends the morning line at one shared sink.

Undersized water heater

A soaking tub and a second shower can outrun an old tank heater. We check its size early and plan a larger tank or a tankless unit if yours falls short.

Local context

What Your LA Home Type Means for a Primary Suite

Your house’s era decides where the suite fits and how the new bath reaches the sewer. Here’s what each type usually allows.

1940s–60s

Single-Story Ranch

Ranches in Encino and Woodland Hills suit a ground-floor suite off the back bedroom hall. The slab means the new drain runs in a trench to the main line, so we locate it with a camera before design.

1980s–2000s

Two-Story Stucco

These homes usually put the suite upstairs, over the garage or a rear bump-out. We stack the new bath above an existing one when we can, which keeps the drain short and the ceilings below intact.

1910s–30s

Craftsman Bungalow

Bungalows in Eagle Rock and Highland Park sit on raised foundations, so the suite’s plumbing runs in the crawlspace. HPOZ review may set the roof pitch and siding [verify].

Any era

Hillside Homes

A hillside suite often steps down the slope below the main floor. If the bath sits lower than the sewer line, it needs an ejector pump, and the Hillside Ordinance limits size [verify].

Any era

One-Bathroom Houses

Adding a primary bath here doubles your bathrooms, so we check the main sewer line, the water heater, and the water pressure first. Old clay or cast-iron lines often get replaced during the work.

Permits & code

Do You Need a Permit for a Primary Suite in LA?

Yes. A primary suite adds floor area, plumbing, and wiring, so LADBS needs plans, plan check, and inspections from footings to final. City Planning rules on floor area and setbacks come first [verify for your zone].

Part of the addition permit

Usually permit-free

Bedrooms need an egress window

The California Residential Code calls for an emergency escape opening in every sleeping room [verify code section]. We size the bedroom window for it on the first sketch, so the design doesn’t shift in plan check.

Title 24 covers the new suite

California’s Title 24 energy code sets insulation, window, and lighting rules for the addition. A Title 24 report goes in with your plans, and the inspector checks the work before drywall.

Smoke and CO alarms go in too

A permitted addition usually brings interconnected smoke alarms and carbon monoxide alarms through the house [verify]. We wire them into the plan, so the final inspection doesn’t stall on the old hallway.

Why choose us

Why Homeowners Pick Us Over the Lowest Bid

The lowest addition bid in Los Angeles usually leaves out the engineering, the footings, or the roof tie-in. We price the real scope during design, so your change-order column stays close to empty.

Licensed & Insured

CSLB Lic. [#000000]

Free On-Site Estimates

Measured, not guessed

Written Warranty

On our workmanship

Local LA Crews

No day labor on site

The schedule

How Your LA Primary Suite Gets Built

A permitted primary suite runs in six phases. Plan check and inspections set most of the pace, not the carpentry.

Phase 01

Survey & layout

We survey the lot, find the sewer line, and sketch bedroom, bath, and closet options. You pick one layout before we draw the full set.

Phase 02

Design & engineering

We draw the plans, the engineer sizes footings and beams, and you choose tile, tub, and vanity. This phase runs about [6–10] weeks.

Phase 03

Plan check & permit

LADBS reviews the plans and the Title 24 report, often for [8–12] weeks. We answer corrections and order long-lead items like the tub and windows.

Phase 04

Foundation & plumbing

We dig footings, trench the new drain to the sewer, and pour. The city inspects the footings and the underfloor plumbing first.

Phase 05

Framing & rough-ins

Walls, roof tie-in, and windows go up in [3–5] weeks. Rough plumbing, wiring, and sound insulation then pass inspection before drywall.

Phase 06

Finishes & final

Tile, vanity, closet, and doors go in over [5–8] weeks. After final inspection, we open the wall to the house.

Free suite consult

Place Your LA Suite Before You Pick Tile

One visit tells you where the suite fits on your lot, how the bath reaches the sewer, and when we could start. The consult is free, and you won’t sign anything.

or send the form and we’ll call you back.

Book a Free Consultation

We walk the lot, find your sewer line, and sketch where the suite fits. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Home-Additions Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Primary suite addition, Home addition, Room addition, Second-story addition, Bump-out, Not sure yet), Preferred date, Tell us about your house and lot. Submit button: Book My Free Visit (red #E12228).

Service area

Primary Suite Additions Across Los Angeles County

We add primary suites from Los Feliz to Manhattan Beach and up to Tujunga, in ranches, bungalows, and hillside homes. Don’t see your neighborhood below? Call and ask.

Questions

Primary Suite Addition FAQs

Click a question to see the answer. The first one is open to start.

Still stuck on something?

Call and a project manager answers, not a call center.

Most suites need a bedroom, a bath, and a closet in one footprint, often around [300–500] square feet. Your floor-area limit and setbacks set the real cap, so we check them in ZIMAS before we sketch anything.

Usually, yes, if the new drain can reach your sewer line with enough slope. We run a camera through the main line first. If the bath sits too low or too far away, an ejector pump or a new branch line solves it.

Go ground floor if you plan to stay into retirement or want a door to the yard. Go upstairs if your yard is small or you want distance from the street. An upstairs suite also means engineering and a stair.

It often does, because it adds a bedroom and a bath. We’re builders, not appraisers, so ask a local agent or appraiser to run comparable sales. For tax effects, ask the LA County Assessor about new-construction assessment.

A ground-floor suite with a no-step entry, a curbless shower, and doorways at least [36] inches wide. Add blocking for grab bars and a shower bench now, even if you won’t need them for years.

The new drain ties into your sewer line, either in a trench under the slab or through the crawlspace. Supply lines branch from the nearest main, and the city inspects both before the floor or walls close.

Plan on at least [5] feet of width for rods on one side, or about [7] feet for rods on both sides with an aisle. Measure your current hanging space, and we’ll size the closet to beat it.

We put sound insulation in the shared walls and ceiling, hang a solid-core door, and use closets between rooms as a buffer. Placing the suite at the far end of the house does the most, so we start there.

Yes. Any addition with a bedroom and bath needs LADBS plan check, a building permit, and inspections. We pull the permit [in our name, confirm], prepare the Title 24 report, and book every inspection through final.

Most families do. We build the suite behind a sealed wall and open it into the house near the end. Expect noise on foundation and framing days, and a short water shutoff when the plumbing ties in.

More services

Other Remodels We Handle in LA

Kitchen Remodeling

Cabinets, countertops, islands, and permits under one contract.

Whole-Home Remodeling

Every room, system, and permit on one schedule, with one team.

ADU Builders

Detached ADUs, garage conversions, and JADUs, designed and built.

From the blog

Primary Suite Guides for LA Homeowners

BOOKING STARTS FOR [MONTH] AND [MONTH]

Get Your Primary Suite Planned in One Visit

A primary suite gives you a quiet bedroom, your own bath, and a closet that fits. Los Angeles Home Remodelers designs, permits, and builds it under one contract. Book your free suite consult today.

Mon–Sat, 8am–6pm

Book a Free Consultation

We walk the lot, find your sewer line, and sketch where the suite fits. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Home-Additions Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Primary suite addition, Home addition, Room addition, Second-story addition, Bump-out, Not sure yet), Preferred date, Tell us about your house and lot. Submit button: Book My Free Visit (red #E12228).