HomeHome AdditionsSecond-Story Additions

Licensed Second-Story Builders

Second-Story Additions in Los Angeles, CA

A new second floor on engineered footings and shear walls, with the stair, roof, and move-out planned before demo.

CSLB Lic. [#000000]  |  Bonded & Insured  |  Written Workmanship Warranty

Book a Free Consultation

We check the lot, the foundation, and the height limit, then tell you if going up fits. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Home-Additions Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Second-story addition, Home addition, Room addition, Primary suite addition, Bump-out, Not sure yet), Preferred date, Tell us about your house and lot. Submit button: Book My Free Visit (red #E12228).

Free Second-Story Visit

We read your lot on ZIMAS and walk the house, then tell you how high you can go. Book a slot.

Dry Before Roof-Off

A temporary roof plan comes before any shingles come off. See how it works.

Second stories in LA

Go Up, Keep the Yard: LA Second Floors

Serving: Burbank, Glendale, Eagle Rock, Mar Vista, Westchester, Torrance, and Sherman Oaks.

Los Angeles Home Remodelers designs and builds the second story addition Los Angeles families ask about when the yard’s too small to build out. You get new bedrooms upstairs, and we handle the survey, engineering, permits, framing, and roof under one contract.

Every second story starts below grade. We dig test holes at your existing foundation first, because what’s down there decides the design.

Most LA houses weren’t built to carry a second floor. A 1950s ranch house often sits on shallow footings, so a structural engineer sizes new footings and shear walls before anyone picks a window.

Certified Service
CSLB Lic. [#000000]

More addition services

Other Ways to Add Space in Los Angeles

Going up isn’t the only answer. If your lot has room behind the house, or you only need one suite, these pages cover the other additions we build.

Not sure where to start?
[YOUR PHONE]

Home Additions in Los Angeles

More square footage out or up, designed to match the house and permitted under one contract.

SEE THE SERVICE →

Room Additions

A bedroom, family room, or bump-out off the back or side, tied into your roof and walls.

SEE THE SERVICE →

Primary Suite Additions

A bedroom, bathroom, and walk-in closet of your own, on the ground floor or upstairs.

SEE THE SERVICE →

Choosing a Second-Story Contractor in Los Angeles

Ask who the structural engineer is and when they’ll see your foundation. A builder who prices a second story before anyone digs a test hole is guessing, and you’ll pay for the guess later.

Compare what each bid carries. Low second-story bids often leave out the new footings, the hold-downs, or the temporary roof, then add them as changes once the roof’s off. We price every line below up front.

How we build up

What Going Up With Us Looks Like

One project manager

Your project manager runs the survey, design, permits, and build, and answers your calls. You never chase an architect, an engineer, and a framer for three different answers.

Written scope, signed changes

Opening a roof and a foundation turns up surprises. Each one gets photographed, priced, and signed by you before a crew touches it, so the final invoice matches what you approved.

A dry, locked site nightly

A sealed-off work zone, floor protection inside, and a locked site each night. We tell you ahead of time which days the new wall opens into the house.

Structure and design

Five Steps That Decide Your LA Second Story

Five decisions set whether your house can go up and what it takes. Settle the foundation and the height first, because they decide how big the upper floor can be and where it sits.

New Footings

We dig test holes beside your existing foundation to measure footing depth and width. If they're too shallow for a second floor, the structural engineer adds new footings or grade beams, which are concrete beams poured under the walls that take the new load.

Shear Walls

Shear walls are wall sections sheathed in plywood that keep the house from racking in an earthquake. Hold-downs are steel straps that bolt each end to the footing, so an upper floor can't lift off.

Stair Location

Stairs take a slice of your ground floor, usually a bedroom closet or part of the hall. We place them in the first sketch so the upper hallway lines up and nobody loses the room you use most.

Roof Off

Roof removal leaves the house open for [1–3] weeks while the new floor gets framed. We watch the forecast, keep a temporary roof of framed tarps ready, and time demo for a dry stretch, so rain stays out of your ceilings and walls.

Height Limits

Your lot's height limit and encroachment plane set how tall the upper floor can be and how far it steps back from the side lot lines. We check both in ZIMAS before design [verify].

Second-story forms

Five Ways to Go Up on a Los Angeles Lot

Pick the form that fits your floor-area limit and your budget. A full second floor isn’t always the best use of the room you’re allowed.

Full Second Story

A new floor over the whole footprint. It gives you the most bedrooms, and it almost always means new footings, new shear walls, and moving out.

Partial Second Story

An upper floor over one wing, often the bedroom side. It carries less load, keeps part of the old roof, and may leave more of your ground floor untouched.

Pop-Top

A pop-top addition raises the roof to add one room, a loft, or taller ceilings. It suits a single bedroom upstairs when your floor-area limit is tight.

Over-Garage Addition

A room built over an attached garage. The garage slab and footings still need checking, and the room needs its own insulation over the cold space.

Stepped-Back Upper Floor

The upper walls sit back from the lower ones. That keeps you inside the encroachment plane and gives neighbors more light and privacy.

Up or out

Full, Partial, or Over the Garage in LA?

Each form changes how much of the house gets opened and whether you’ll live elsewhere for the build. Pick the form first, then the floor plan, because the form sets the structure.

Addition type

Best for

Watch out for

Move out?

Full second story

Three or more new bedrooms

New footings and full roof removal

Usually, for [4–8] months

Partial second story

A suite plus a bedroom upstairs

Old and new roofs must tie in cleanly

Often, for part of it

Pop-top (raise roof)

One room or a loft upstairs

Tight stair room on small plans

Sometimes, for [2–6] weeks

Over-garage addition

Stucco homes with a garage

Garage slab may need footings

Rarely; most stay home

Build out instead

Lots with yard and setback room

Gives up yard; see Room Additions

No, most stay home

Going up

Build up when your yard is small, you want to keep it, or setbacks leave no room to the side or rear. It costs the most per room because of the structural work.

Going out

Build out when the lot has open yard and the foundation is shallow. You’ll usually stay home through the work. Room Additions covers this path in detail.

Up and out

A small rear addition on the ground floor can hold the new stair, so the upstairs gains bedrooms and your downstairs keeps every room it has now.

Staying under an open roof

Living in the house while the roof’s off means dust, no ceiling in some rooms, and power cut for days. Plan the move-out before demo, not during it.

Local context

How Your LA House Type Shapes a Second Story

Your home’s era and street decide what the foundation, the zoning, and the roof bring to the job. Here’s what we usually find.

1940s–60s

Valley Ranch on Slab

Ranches in Woodland Hills, Northridge, and Reseda often sit on thin slabs with shallow perimeter footings. Adding a second story to a ranch house here almost always means new footings along the walls that carry the upper floor.

Any era

Westside R1 Lots

Many Westside streets sit in an R1 Variation Zone, which can lower the height or change the encroachment plane on your lot [verify]. Check it first, because it decides how much second floor fits.

1950s–70s

Hillside Homes

Hillside lots follow the Baseline Hillside Ordinance, with its own floor-area and height rules [verify]. A second story here may need a soils report, deeper footings, and a street-access plan for trucks.

1920s–30s

Craftsman and HPOZ

Craftsman bungalows sit on raised foundations that often need bolting and new footings. In an HPOZ, the upper floor usually has to stay low and set back so the street view doesn’t change [verify].

1980s–90s

Stucco With 2-Car Garage

These homes already have deeper footings and some shear walls, so an over-garage room or a partial second story often fits. We still check the garage slab and the header over the door.

Permits & zoning

Do You Need a Permit for a Second Story in LA?

Yes, always. A second story needs zoning review, structural plan check, and LADBS inspections from footings to final. LA City Planning rules set how big and how tall it can be, and LADBS checks the engineering.

Permit and review needed

No permit needed to start

Height and the encroachment plane

The Baseline Mansionization Ordinance caps floor area on most flat R1 lots and adds an encroachment plane, an angled line the upper walls can’t cross [verify]. Your R1 Variation Zone, if any, can change both.

Hillside lots follow their own rules

The Hillside Ordinance adds its own height and floor-area limits on slope lots, and it counts grading too [verify]. We check which rules apply before design, so your plans fit the first time.

Engineering goes to plan check

LADBS reviews the structural engineer’s calcs for the new footings, shear walls, and hold-downs. Plan check often sends corrections, and we answer them and resubmit for you [confirm].

Why go up with us

Why Homeowners Pick Us Over the Lowest Bid

The lowest second-story bid in Los Angeles often skips the test holes and the hold-downs. We price both on day one, so they don’t show up later as change orders.

Licensed & Insured

CSLB Lic. [#000000]

Free On-Site Estimates

Measured, not guessed

Written Warranty

On our workmanship

Local LA Crews

No day labor on site

The schedule

How a Second Story Gets Built in Los Angeles

A permitted second story runs in six phases. Plan check and the roof-off stretch set the pace, not the finishes.

Phase 01

Feasibility & survey

We pull your zoning in ZIMAS, survey the lot, and dig test holes. You learn how big the upper floor can be within [2–4] weeks.

Phase 02

Design & engineering

You approve the floor plan, the stair spot, and the elevations. The structural engineer then designs footings, shear walls, and hold-downs over [6–10] weeks.

Phase 03

Plan check & move-out

We file with LADBS and answer corrections, which runs about [3–6] months. You use that time to line up a rental and pack.

Phase 04

Foundation & roof off

We pour new footings, then remove the roof in a dry stretch. A temporary roof stays ready until the new floor is sheathed.

Phase 05

Framing & dry-in

Framers build the upper floor, shear walls, and roof, and the house is dry within about [3–5] weeks. The city inspects each step.

Phase 06

Systems, finishes & final

HVAC, wiring, drywall, and floors go in over [3–5] months. After final inspection, we walk the house with you and fix your list.

Second-story consult

Find Out If Your House Can Go Up First

One visit tells you what your zoning allows, what your foundation likely needs, and whether you’ll move out. The consult’s free, and you won’t sign anything.

or send the form and we’ll call you back.

Book a Free Consultation

We check the lot, the foundation, and the height limit, then tell you if going up fits. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Home-Additions Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Second-story addition, Home addition, Room addition, Primary suite addition, Bump-out, Not sure yet), Preferred date, Tell us about your house and lot. Submit button: Book My Free Visit (red #E12228).

Service area

Second-Story Additions Across Los Angeles County

We add second floors from Burbank to Torrance, on flat Valley slabs, Westside R1 lots, and hillside streets. Don’t see your neighborhood below? Call and ask.

Questions

Second-Story Addition FAQs

Tap a question to see the answer. The first one is open to start.

Still weighing up or out?

Call and a project manager answers, not a call center.

Sometimes as-is, but usually not without work. Most older LA homes need new footings or grade beams under the walls that carry the upper floor. We dig test holes at your existing foundation, and a structural engineer decides what’s needed before design starts.

Usually, yes, for a full second story. The roof comes off, ceilings open, and power and water get cut on and off for weeks. Plan on [4–8] months away. A pop-top or over-garage room often lets you stay, with a shorter move out or none.

Plan on [12–20] months from first visit to final inspection. Design and engineering take [2–4] months, plan check [3–6] months, and construction [6–10] months. Hillside lots and HPOZ review add time. We give you a phased schedule before you sign.

Building out usually costs less per room, because it skips roof removal, the new stair, and most of the shear-wall work. Going up wins when land is tight and your yard matters to you. We price both on the same lot so you compare real numbers.

It depends on your zone. Most flat R1 lots have a height limit and an encroachment plane under the Baseline Mansionization Ordinance, and R1 Variation Zones or the Hillside Ordinance can change them [verify]. We read your lot in ZIMAS before drawing anything.

Stairs usually land where a closet, a hall, or part of a small bedroom sits now. A straight run needs roughly [10–12] feet of length, and it must meet code for rise, run, and headroom [verify]. We sketch two or three spots so you pick what you’ll give up.

It can, so we plan windows with neighbor privacy in mind. Side windows go high or use obscured glass, and bigger windows face the street or your own yard. Stepping the upper floor back also keeps light on the lots next door and eases neighbor concerns.

You need a building permit from LADBS, which covers zoning review, structural plan check, and energy compliance. Hillside lots may need a soils report, and HPOZ homes need design review first [verify]. We prepare the plans, file them, and answer every plan-check correction.

Most second floors get their own system or a separate zone, because heat rises and the upstairs runs warmer. A ducted heat pump in the new attic or a ductless mini-split are common choices. Title 24 sets the insulation and efficiency the plans must show [verify].

Usually, yes. The LA County Assessor typically adds the value of new construction to your existing assessed value, while the original house keeps its base [verify]. We’re builders, not tax advisors. Ask the Assessor how an addition affects your bill.

More services

Other Remodels We Handle

Kitchen Remodeling

Cabinets, countertops, islands, and permits under one contract.

Whole-Home Remodeling

Every room, system, and permit on one schedule, with one team.

ADU Builders

Detached ADUs, garage conversions, and JADUs, designed and built.

From the blog

Planning Guides for Going Up in LA

DESIGN SLOTS OPEN FOR [MONTH] AND [MONTH]

See How High You Can Go in One Visit

A second story gives you more bedrooms without giving up the yard or the neighborhood. Los Angeles Home Remodelers handles the engineering, permits, roof, and stair under one contract. Book your free second-story consult today.

Mon–Sat, 8am–6pm

Book a Free Consultation

We check the lot, the foundation, and the height limit, then tell you if going up fits. No charge, no obligation.

[contact-form-7 id="YOUR-FORM-ID" title="Home-Additions Lead Form"]

Form fields: Full name, Email, Phone, Project address, Scope (Second-story addition, Home addition, Room addition, Primary suite addition, Bump-out, Not sure yet), Preferred date, Tell us about your house and lot. Submit button: Book My Free Visit (red #E12228).