Cabinets, countertops, islands and permits under one contract, planned around the age of your LA home.
CSLB Lic. [#000000] | Bonded & Insured | Written Workmanship Warranty
We measure the room, check your cabinet boxes and scope the job. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Full kitchen remodel, Cabinet refacing, New or custom cabinets, Countertop installation, Kitchen island, Not sure yet), Preferred date, Tell us about your kitchen. Submit button: Book My Free Visit (red #E12228).
We measure the room and tell you if your cabinet boxes are worth saving. Book a slot.
LADBS filing, plan check, and inspections handled for you. See how it works.
Serving: Los Angeles, the San Fernando Valley, Burbank, Glendale, Pasadena, and the Westside.
Los Angeles Home Remodelers handles kitchen remodeling in Los Angeles from the first measurement to the final inspection. You get one contract for the cabinets, countertops, island, wiring and permit, so no vendor blames another when the counter doesn’t fit.
Every job starts with an honest scope call. If your cabinet boxes are solid, we’ll tell you refacing gets you most of the look for less work.
LA kitchens hide different problems by era: knob-and-tube wiring in 1920s Spanish homes, soffits in 1950s Valley ranches, stack plumbing in Westside condos. We plan for yours before demo, not after.
Certified Service
CSLB Lic. [#000000]
Book one service or combine all four. Each page below explains what the work involves, which kitchens it fits, and what to ask before you sign.
Not sure where to start?
[YOUR PHONE]
New doors, drawer fronts, and veneer over solid cabinet boxes. Done in days, not weeks.
SEE THE SERVICE →
Built to your exact walls, including out-of-square rooms and ceiling-height runs.
SEE THE SERVICE →
Quartz, granite, quartzite, and porcelain, templated after your cabinets are set.
SEE THE SERVICE →
Islands and peninsulas sized for clearance, with seating, power, or a prep sink.
SEE THE SERVICE →
Ask for the CSLB license number first. Look it up on the state board’s site, then check that the classification covers the whole job, not just cabinets or just stone.
Compare bids line by line. A low number often leaves out the permit, the stone seams or the island’s wiring, then bills them later as changes. Every line below gets priced in your contract up front.
Your project manager answers the phone, walks the site, and owns the schedule. You never chase a subcontractor for an answer about your own kitchen.
Everything in the contract is a line item. Any change gets priced and signed before a crew touches it, so nothing shows up on a final invoice as a surprise.
Dust barriers at the openings, floor protection along the path, and cleanup at the end of each day. Most homeowners stay in the house through the whole job.
Your layout sets the budget more than your finishes do. Moving a sink, a range or a wall turns a cabinet refresh into a full remodel, so settle the floor plan before you pick a slab.
Two parallel runs with a walkway between them. Galleys give you the most counter per square foot, which is why Craftsman bungalows and older duplexes have them. Keep the walkway at [42–48] inches so two people can pass.
Two adjoining walls and one corner. L-shapes open into a dining area and leave room for a table or a compact island. Corner cabinets waste space unless you add a pull-out unit.
Three walls of cabinetry. U-shapes hold the most storage of any layout and suit cooks who want everything in reach. They close the room off, so plan a doorway or pass-through for light.
An L or U with a freestanding work surface in the middle. Islands need about [42] inches of clearance on every working side, which rules them out in most rooms under 12 feet wide. A sink in the island means trenching the slab in postwar homes.
An island attached at one end. Peninsulas give you seating and prep space when the room's too narrow for a true island, and they don't need clearance on the fourth side.
Match the kitchen to the house, not to a showroom. A flat-panel modern kitchen fights a 1920s Spanish Revival, and buyers notice.
Recessed-panel doors, stone tops, simple metal pulls. Shaker reads current without dating fast, and it’s the easiest door style to order for a refacing job.
Slab doors, integrated pulls, long horizontal lines. Flat-panel suits mid-century post-and-beam homes, and it shows every misaligned reveal, so installation tolerance matters.
Arched openings, hand-glazed tile, dark wood, wrought-iron hardware. This style belongs to the 1920s and ’30s stock across Silver Lake, Los Feliz, and Hancock Park.
White oak, honed stone, and no upper cabinets on one wall. Warm minimal trades storage for light, so it needs a pantry or a deep island to work in a family kitchen.
Darker base cabinets under lighter uppers. Two-tone hides wear at floor level and makes a small kitchen feel taller than a single finish does.
Pick the countertop and the cabinet construction together. The slab sets the backsplash and sink, and the boxes decide whether refacing is even an option.
Countertop
Best for
Watch out for
Upkeep
Quartz
Busy family kitchens and rentals
Scorches under hot pans; fabrication rules are changing in CA
Wipe clean, no sealing
Granite
Cooks who want heat tolerance
Pattern varies slab to slab, so approve your exact slab
Seal every [1–2] years
Quartzite
Cooks who want a marble look that’s tougher
Some slabs sold as quartzite are soft; test yours
Seal every [1–2] years
Marble
Bakers and period homes
Etches from lemon, wine and vinegar within seconds
Seal, and accept the patina
Porcelain slab
Waterfall edges and outdoor kitchens
Chips at exposed corners if it’s knocked
Wipe clean, no sealing
Built to your exact walls. Choose these for out-of-square rooms, ceiling-height runs, and hillside homes where nothing is plumb. Longest lead time of the four.
Stock boxes with your choice of door, finish, and interior fittings. Sizes step in 3-inch increments, so fillers cover the gaps. Most LA remodels land here.
Off-the-shelf boxes in a handful of finishes. Fast to get and fine for rentals, though the boxes are thinner and the hinges wear sooner.
New doors and veneer over your existing boxes. Refacing works when the boxes are sound and the layout already suits you. It won’t fix a bad floor plan.
The year your house was built decides half the scope. Here’s what our crews usually find behind the cabinets, by era.
1920s–30s
Expect knob-and-tube wiring, galvanized supply lines, and plaster over wood lath. Narrow galley kitchens rarely fit an island, so a peninsula usually works better. Original tile and arches are worth saving.
1940s–60s
Slab foundations mean any sink move, including one into an island, gets trenched and re-poured. Many have a soffit above the uppers. Removing it gains storage but can mean rerouting ducts.
1950s–70s
Exposed beams and glass walls leave nowhere to hide ductwork. A vent hood usually routes straight through the roof, and window walls cap how much cabinetry the room can hold.
Any era
Access drives the schedule here. Narrow streets and stair-only entries turn slab delivery into a crew job, so we price access as its own line instead of burying it.
Any era
Your HOA controls work hours, elevator use, and anything tied to stack plumbing. Stone slabs need an elevator booking, and HOA approval often takes longer than the city permit.
Swapping cabinets and counters in the same layout usually qualifies for an LADBS express permit filed online. Moving a wall, or running new plumbing or wiring through one, needs plan check at a Construction Services Center.
California’s energy code (Title 24) requires JA8-rated, energy-efficient fixtures in kitchens plus controls on the switches. Your electrical spec has to match the plan you submit, or the inspector sends you back.
Structural work needs stamped drawings from an engineer before LADBS reviews it. Building your calendar around the permit is what keeps a demolished kitchen from sitting open.
In 2026, Cal/OSHA moved to ban fabrication of high-silica engineered stone. The documented risk falls on workers who cut the slabs. Ask where yours is cut, or pick quartzite or porcelain.
The cheapest kitchen bid in Los Angeles almost always costs more by the end. We scope the real work on day one, so your change-order column stays close to empty.
CSLB Lic. [#000000]
Measured, not guessed
On our workmanship
No day labor on site
A permitted kitchen runs in six phases. Your dates shift with cabinet lead time and plan check, but the order never changes.
Phase 01
We measure the room, check the cabinet boxes, and build a plan you sign off on. Nothing gets ordered before that signature.
Phase 02
Drawings go to LADBS while your cabinets go into production. This is the wait most homeowners underestimate, and it runs in parallel on purpose.
Phase 03
Dust barriers go up, cabinets and flooring come out, and the plumber and electrician run new lines. A rough inspection closes the phase.
Phase 04
Drywall, texture, paint, then flooring. The room looks empty and finished at the same time, which is the strangest week of the job.
Phase 05
Boxes get set and leveled, then the fabricator templates your counters off the installed cabinets. Stone comes back about [a week] later.
Phase 06
Backsplash, hardware, appliance hookups, final inspection, and your punch list. We don’t call it done until you do.
One visit gets you a measured plan, a straight answer on reface vs. replace, and a realistic start window. You don’t pay for it, and you don’t sign anything.
or send the form and we’ll call you back.
We measure the room, check your cabinet boxes and scope the job. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Full kitchen remodel, Cabinet refacing, New or custom cabinets, Countertop installation, Kitchen island, Not sure yet), Preferred date, Tell us about your kitchen. Submit button: Book My Free Visit (red #E12228).
Our crews work across the city, the Valley, and the beach cities, including hillside streets and HOA buildings. If your neighborhood isn’t listed, call and ask.
Click a question to see the answer. The first one is open to start.
Reface if the boxes are solid and you like the layout. You get new doors, drawer fronts, and veneer in days. Replace if the boxes are water-damaged, sagging, or in the wrong place, because refacing can’t fix a bad floor plan.
Yes, as of [Month Year]. Cal/OSHA is moving to ban fabrication of high-silica engineered stone because cutting it has caused silicosis in stone workers. The rule isn’t final. Quartzite, granite, and porcelain give you a similar look without the fabrication concern.
Usually, yes. Swapping cabinets, counters, and fixtures in the same layout typically qualifies for an LADBS express permit. Moving a wall, or running new plumbing or wiring through one, needs plan check. We pull the permit and book the inspections.
A full remodel runs about [6–10] weeks on site, after [4–8] weeks of cabinet lead time. Plan check adds [2–6] weeks. Refacing alone takes about [3–5] days, and a countertop swap about [1–2] weeks from template to install.
Plan [42] inches on every working side, and [48] if two people cook at once. Rooms narrower than 12 feet usually take a peninsula instead, which buys you the same seating without the clearance problem.
Usually, yes. A sink needs a drain and vent line, which means cutting the slab in most postwar homes. A cooktop needs its own circuit or gas line plus venting. Both add a permit line, so decide before the cabinets are ordered.
Semi-custom cabinets come in set sizes, usually in 3-inch steps, with your choice of door and finish. Custom cabinets are built to your exact walls. Choose custom for the out-of-square rooms and odd corners common in older LA homes.
Most homeowners do. We seal the openings with dust barriers, protect the path from the door, and clean the site each evening. Set up a temporary kitchen with the fridge, a microwave, and a sink you can still reach.
We stop, photograph it, and price the repair as a written change order before touching it. Pre-1940s homes turn up knob-and-tube wiring and galvanized pipe often enough that a contingency is worth setting aside.
Every line of scope, the allowance for each finish, permit costs, disposal, and the payment schedule. If a line isn’t on the estimate, it isn’t in the price, and we’ll tell you which items are still allowances.
Full gut baths, wet-room showers, and waterproofing done to code.
Detached ADUs, garage conversions, and room additions from plans to permit.
Every room on one schedule, one permit set, and one crew.
BOOKING STARTS FOR [MONTH] AND [MONTH]
A scoped kitchen is one you can budget, schedule, and live through. Los Angeles Home Remodelers handles cabinets, countertops, islands, and permits under one contract. Book your free in-home visit today.
Mon–Sat, 8am–6pm
We measure the room, check your cabinet boxes and scope the job. No charge, no obligation.
Form fields: Full name, Email, Phone, Project address, Scope (Full kitchen remodel, Cabinet refacing, New or custom cabinets, Countertop installation, Kitchen island, Not sure yet), Preferred date, Tell us about your kitchen. Submit button: Book My Free Visit (red #E12228).